
The operational question
A clear proposal identifies every area, camera count, models or capabilities, recorder, storage, network and cabling method.
Design implications
It should separate inclusions, exclusions, client responsibilities, access, permits, hidden conditions and the change process. Drawings and photos reduce interpretation.
A better next step
Acceptance criteria should verify views, recording, remote access, time, export and documentation before closeout.
Information to prepare
- A floor plan or clear property sketch
- Priority areas and required evidence
- Existing equipment, network and power
- Timeline and realistic project budget
