
The operational question
The right count begins with objectives: deter, detect, observe, recognize and identify. An overview image and an identification image are not the same shot.
Design implications
Entrances, registers, docks, storage, yards and corridors require different distances and lenses. A floor plan prevents redundancy and exposes blind spots before drilling begins.
A better next step
SecureView documents every position and its purpose so the final count can be justified operationally and financially.
Information to prepare
- A floor plan or clear property sketch
- Priority areas and required evidence
- Existing equipment, network and power
- Timeline and realistic project budget
